🚀 Elevate Your Flight Experience!
The ParkZone SV80 Long Lead 3-wire servo is specifically designed for the Spitfire Mk IX, providing precise aileron control with a generous 400mm lead length for flexible installation. Its robust 3-wire connectivity ensures reliable performance, making it an essential component for serious model aviation enthusiasts.
S**D
Works fine.
It’s a servo. goes left and right but it was pricey compared to other servos.
L**.
Decent servo.
It's a decent servo for the money. I like the longlead wire. Great for using on wings. Just wish is was metal gear.
A**R
great product
great product and seller
B**Y
Works my flaps.
Using this for flaps on a Carbon Cub S+, does the job, now if I could only teach myself to land, instead of a controlled crash.
J**L
Good Product
Works perfect, no issues.
M**G
PRODUCT WAS PERFECT FOR MY HOBBY
exact replacement for my Valiant rc airplane
V**T
Four Stars
good price.
C**R
SV80 Long Lead Servo - Analog
The Parkzone long lead SV80 servos work fine but be aware that they are analog so can't be used with AS3X or other stabilization technologies, they require digital servos.
D**Y
Five Stars
My husband flies model planes. This item is what he wanted/needed.
Trustpilot
4 days ago
3 weeks ago