







🐾 Train, Play, Repeat! Your dog's new favorite leash awaits!
The Fanshiontide Dog Training Lead Leash is a 10m/33ft long, durable polypropylene leash designed for training and outdoor activities. It features a high-quality swivel-style zinc alloy buckle for secure attachment and is suitable for various dog breeds, making it a versatile choice for pet owners.








| Package Dimensions | 14.4 x 13.7 x 3.1 cm; 160 Grams |
| Item model number | 7D6O56HB11553 |
| Breed Recommendation | Medium Breeds;Large Breeds;Small Breeds |
| Closure | Hook and Loop |
| Colour | Black |
| Size | Large |
| Number of Items | 1 |
| Quantity | 1 |
| batteries required | No |
| Batteries Included | No |
| Item Weight | 160 g |
F**N
Good quality arrived quickly
Great training line - good length and the bright colour makes it easy to spot even in long geass
S**A
Good
I bought this because my cat kept running off, i think overall ut did what is was supposed to.
T**Y
TOO HEAVY!
I bought this especially for training my puppy (toy poodle) BUT even though it was described for large, medium & small dogs, I found the clip is much too heavy and there wasn’t an alternative. Quite disappointed.
L**E
Good lead
Strong, sturdy & no problems so far.
D**K
Long leash
We are doing a spot of retraining for our dog and were advised to introduce a long lead like this. It functions well but I find that the material is still stiff and knots very easily even though I hold the surplus in loops and feed it in and out through my hands as needed. Maybe the lead will get more supple as it ages.
A**R
Does the job!
Handy for practising recalls and they think they are off the lead. Takes some getting used to. Don't instantly think your pup is tangled up,because the knots, they just seems to work their way out.
K**M
Lovely
Not used it yet waiting for nice weather to train off lead
L**S
Very thin
Nightmare to hold when not at full length. Very thin, pup chewed through it straight away 🙁
Trustpilot
2 weeks ago
2 weeks ago